Project Type

Welfare Unit

Client

Thornhill Engineering

Project Location

Doncaster, England

A recent project in Doncaster that included an arrangment of offices and welfare.  Start to finish in a week.  In a superb white wipe clean finish that will last for years

Project Type

Welfare Units

Client

Cadent Utilities Welfare Units

Project Location

Stoke, England

to create 3 x welfare units

maintenance free, Hard wearing food grade products

fully insulated, installed in 3 days

Project Type

Gearbox Clean Room

Client

LUR Trafford Park

Project Location

Manchester, England

to create a cleanroom for the engineers to survey train wheel bearings

wide doors for good access and glazed areas for good viewing

all completed in a week

Project Type

Site Office

Client

Construction Ltd

Project Location

Wimbledon, England

a small site cabin in a difficult to reach area

fully insulated panels so the project management can continue on site

Project Type

Warehouse Office

Client

Enterprise foods

Project Location

Manchester, England

A recent project in Manchester, creating more warehouse office space

2 offices created next door to existing offices, they soon start to take shape

approx 6m x 8.4m x 2.7m high with a dividing wall

windows are easily installed into our system

making for a superb finish, and all installed in 2 days

Flashings finish the project off and door installation make the offices a truly professional install

Project Type

Pop Up Cabin

Client

SixT Valet Parking

Project Location

Aberdeen, England

2 site offices for SIXT valet parking . both situated in Multi storey car parks

fully insulated fire rated panels all prepped off site to aid rapid install

this one is in the heart of London

this one on the 8th floor in Aberdeen

tailor made to suit the concrete plinth

Project Type

Flexible Office Space

Client

Sherlock Homes

Project Location

Kensington, England

High above Eaton Square in Kensington London, office space required while the residence has a major fit out

All the panels were prepped off-site so once carried through and up the stairs onto the scaffold platform the construction part moves on quickly

Windows and doors slot into the system as required

just a ply floor placed in by the contractor to make it office worthy

Project Type

Custom Cabins

Client

Channing School, London

Project Location

London, England

A site cabin on a busy school site in London

1 of 2 cabins that was needed for a lengthy project when access was so tight they couldn’t get any other type of site office in place

installed onto a level timber and ply floor (by others) this cabin is a perfect site solution and….. fully insulated